Kuching and nearby · Home extensions and renovation

Kuching extensions and renovations, priced line by line.

Kitchen extensions, car porches, bathrooms and full renovations. I measure up for free, give you a written quote with every item listed, and stay reachable on WhatsApp the whole way through.

  • Free measure-up visit in Kuching
  • Every material, brand and cost in writing
  • No extra charges unless you add work
PLAN / EXTENSION +3.6 M
Example plan: terrace house with a rear extension Floor plan of an intermediate terrace house, 6.1 metres wide: car porch 5.5 m, house 14 m, and a 3.6 m rear extension for a wet kitchen, with column and beam positions. Neighbour Neighbour 5500 14000 6100 Porch Living Dining Kitchen Stairs +3600 +3.6 m wet kitchen 1 2 3 4 5 A B
Extension. The back is extended 3.6 m for a wet kitchen. New footings, walls and roof are tied into the existing house.
Drawing Terrace rear extension (example) Scale N.T.S. Dwg no. A-01

Services

What I can do for your home

Big jobs and small ones, all quoted and overseen by me.

Back and kitchen extensions

Kitchen too small? I extend the back of the house for a wet kitchen, store room or extra bedroom, foundations to plumbing, so you don't need anyone else.

Car porches

Can't fit two cars, or rain floods in? I lengthen or raise the roof, put up a new steel frame, lay non-slip tiles and sort the drains.

Renovation

Older house, tired bathrooms, or want living and dining opened up? Re-tiling, plaster ceilings and built-in cabinets too.

Roof leaks and waterproofing

Patched before and still leaking? I find where the water really gets in first, then replace tiles or zinc, or redo bathroom waterproofing.

Wiring and plumbing

Rewiring older houses, adding power points and replacing old pipes.

Grilles and small jobs

Window and door grilles, gates, cracks and repairs. Small jobs are fine.

New houses

Single or double-storey houses on your own land.

Not sure if it's something I do? WhatsApp me a photo and I'll tell you straight away.

Projects

Recent jobs

Drag across each photo to compare before and after, or open the drawing for the job.

The finished wet kitchen: cabinets, double sink, cooker hood and non-slip floor tiles
Back extension of a Kuching terrace under construction: new brick walls, steel roof frame and the waterproofed floor
For illustration BeforeAfter

Kuching

Wet kitchen extension, double-storey terrace

Extended the back for a wet kitchen. New footings, brick walls and roof, and the floor waterproofed like a bathroom.

  • Foundation
  • Brickwork
  • Roof
  • Waterproofing
Finished car porch: extended steel-frame roof, non-slip tiles and a drain grating across the gate
Car porch during the work: half the floor tiled and a new drain pipe being laid
For illustration BeforeAfter

Kuching

Car porch for two cars

Longer roof on a new steel frame, non-slip tiles, and the drain rerouted so water no longer pools at the gate.

  • Steel frame
  • Floor tiles
  • Drainage
Drawing
4200 4800 living dining wall removed new points stairs
Example sketch

Kuching

Opening up an old terrace

Took out the wall between living and dining, rewired the whole house, new ceiling and kitchen cabinets.

  • Rewiring
  • Plaster ceiling
  • Cabinets

How it works

How a job usually goes

Nothing starts until you've seen the written quote and agreed to it.

  1. WhatsApp a few photos

    Send photos of the place and roughly what you want. I'll tell you straight away if it's something I can do.

  2. I come and measure

    We agree a time, then I measure up and check the structure, old pipes and wiring. Free within Kuching.

  3. Written quote

    Materials and labour listed separately, with brands and sizes. The price stays the same unless you add work.

  4. Work starts

    My foreman or I are on site. Busy at work? Just WhatsApp and I'll send you photos.

  5. Clean up and hand over

    Debris cleared, the place washed down, keys back to you.

Reviews

What clients said

In their own words, after the job was handed over.

The quote was very clear, down to the thickness of the steel and the brand of the roof tiles. The final price was exactly what we agreed at the start, with nothing added along the way.
Car porch extensionKuching
While the wet kitchen was being built, the foreman was on site almost every day. We both work during the day, so whenever we had a question we just WhatsApped him and he sent us photos. Very reassuring.
Kitchen extensionKuching
We had two bathrooms knocked down and redone, and our biggest worry was the job dragging on. Their schedule was spot on, and they even worked out the fall to the floor drains, so the water runs off quickly after a shower.
Bathroom renovationKuching

FAQ

Before you decide

How quotes, payment and the work itself are handled.

Didn't find your answer?

Every house is different. Send me a few photos and I'll answer based on your actual situation.

Book a free site visit on WhatsApp

Quotes and payment

Is the site visit and quote free?

Within Kuching, yes. I measure up, check the structure and the existing wiring and plumbing, then give you a written quote. If you're outside Kuching, please check with me first.

What does the quote include?

Materials and labour are listed separately, with brands, specifications and quantities. What is included and what isn't is written down, so there's no confusion later.

Will the cost go up during the job?

The price follows the quote. If you change the design or add work, I quote the extra first and only go ahead once you agree. If opening up reveals a problem with the existing structure or pipes, I show you photos first and we decide together how to deal with it.

How does payment work?

A deposit to start, then progress payments as the work reaches each stage, and the balance at handover. The amount for each stage is set out in the quote.

During the work

How long does a job take?

It depends on the size of the job. After the site visit, the timeline is written into the quote, and if rain or material delays affect it, I let you know early.

Do extensions need council approval?

Most do. When I visit, I tell you whether your job needs approval and which drawings and documents to prepare, so you know where you stand before deciding.

Can we stay in the house during the work?

In most cases, yes. The work area is closed off, the site is cleaned up at the end of each day, and you are told in advance before water or power is cut.

Who does the work?

My own regular crew, with me on site. The job isn't passed on to anyone else.

After handover

What if something comes up after the job?

I only hand over once you've checked everything and are satisfied. If anything comes up after that, contact me directly. I'll come and take a look, and we'll agree on how to fix it.

Do you take small jobs?

Yes. A window grille, a roof leak, a single bathroom: each gets the same care as a whole house.

Contact

Tell me about your job. The site visit is free.

WhatsApp me and send a few photos of the site. I can tell you roughly what's involved before I come and measure.

Open the digital card to share
MIEW Construction & Renovation
Scan to WhatsApp

Ah Hua阿华